Urban Design Concept “Feste Kaiser Franz”
Koblenz, 2025 - 2026
The former military site in Koblenz-Lützel is being developed into a district for crafts, culture, and the creative industries. The preliminary urban design concept combines the preservation of existing structures with new uses and open spaces.
Discipline
Urban Planning
Timeframe
2025 - 2026
Urban Design Concept – Guiding Principle
The former Bundeswehr site administration at the Kaiser Franz fortress in Koblenz-Lützel is to be developed into a publicly accessible quarter for crafts, culture, creative industries and open space. As a basis for further land-use planning, AS+P developed an urban development concept with location analysis, test planning and developed design variants.
Urban design concept based on the “Alleys” and “Courtyards” test planning options
The planning idea is to further develop the special character of the former military site with its historic buildings, striking visual relationships and the location between the railway line, topography and fortifications. The basic urban development structure takes up these qualities, carefully develops them further and creates the basis for flexible district development. The defining elements are the Kreativgasse and the Handwerkergasse with a central square at the Kehlturm. The planning strengthens the permeability of the area and creates attractive open spaces. Existing buildings are preserved, converted and supplemented by new buildings for crafts, culture, creative industries and education. These also have a noise-protecting function along the railway line.
Historically significant existing building within the project area
The development takes place parallel to the railway line and keeps the inner areas largely free of car traffic. Stationary traffic is concentrated at the edges of the district. A biodiversity band integrates ecological compensation measures and strengthens green networks. The usage concept creates a robust and at the same time flexible framework for future requirements and enables the construction areas to be developed in sections. This creates the basis for the revitalization of the conversion site and an identity-creating district with high added value for the district and the local users.


