Zoning Plan for a Hyperscale Data Center
Elsdorf, Germany, since 2024
Preparation of a 25-Hectare Local Development Plan for a Hyperscale Data Centre Development
Discipline
Bauleitplanung
Timeframe
since 2024
Archaeological investigations within the area of the proposed commercial development, August 2026.
The City of Elsdorf, located in the Rhenish mining region, intends to advance Local Development Plan No. 127, initiated in 2021, for the development of a commercial and industrial area of approximately 25 hectares. The plan is intended to establish the statutory planning framework for the development of a hyperscale data centre, including an electrical substation. The local development plan represents a significant milestone in the ongoing structural transformation of this region, historically shaped by lignite mining. Since late 2025, AS+P has been providing the planning services required for the preparation of the plan.
View towards the Hambach open-pit mine adjacent to the planned development area
In addition to the core services for the local development plan, AS+P is responsible for coordinating the various specialist disciplines, including environmental matters, climate, noise protection, transport, air quality, and archaeology. A particular feature of the planning process is that the individual specialist consultancies—predominantly based in the region—have been commissioned by AS+P and act as subcontractors.
Development Plan in Detail
The close coordination between AS+P and the prospective data centre operator, together with ongoing, constructive collaboration with the municipal administration, provides a strong basis for an efficient planning process. Following the initial statutory consultation stage, the draft local development plan is currently being prepared. The planning procedure is scheduled for completion in 2027.