Development plan No. 330 “An der Königsbach”
Koblenz, Germany, 2019 - 2023
Drafting the urban structural concept and preparing Land Use Plan No. 330 “An der Königsbach” in Koblenz for finalization
Discipline
Bauleitplanung
Timeframe
2019 - 2023
Client
CS Asset
Urban Planning Draft Concept
The premises of the “Koblenz Brewery” are located in the south of Koblenz on the B 9 highway. The long-standing historical brewery with its striking tower building has been the subject of urban planning developments since 2018: The relocation of the brewery’s production facilities has freed up space to create new commercial units, but also student housing, as well a new residential district facing the Rhine.
The statutory resolution covering the eastern section of the area was passed in December 2022. AS + P’s urban development concept for the new housing area envisages three to four storey residential buildings. As a result, the area which has lain unused for years will be significantly upgraded in terms of city planning. A particular challenge facing AS+P in drafting the new land use plan was dealing with flooding issues, given that the area is in the direct vicinity of the Rhine. The solution found was to create a series of measures prevent flooding and minimize risks particularly by installing elevated buildings with largely flood free residential storeys and floodable parking spaces. Noise, nature conservation and climatic considerations also had to be taken into account. The urban development concepts were closely coordinated with the authorizing body for such projects, SGD Nord. and enshrined in planning law in the land use plan. It ultimately proved possible to create a sound set of regulations for the planned residential area in a land use plan that meets all requirements.
View South
Existing Brewery Building, Looking South-West